
The ERA decided that Costa Hill would be the best site for their wind driven electric generator and in 1949 they placed an order with John Brown Ltd, the Clyde shipbuilders, for a turbine with 60 feet blades.
The ERA decided that Costa Hill would be the best site for their wind driven electric generator and in 1949 they placed an order with John Brown Ltd, the Clyde shipbuilders, for a turbine with 60 feet blades.
“Strong international partnerships will be critical to developing Scotland’s hydrogen economy and delivering our net zero objectives. I look forward to further collaboration between France and Scotland in the continued development of this work.” Michael Matheson